Show/Hide

Important Updates:

Fullerton Road closure between Railroad Street and Rowland Street/San Jose Avenue for 36 months, starting July 26, 2017.  For more information, contact www.theaceproject.org

Construction Permit

Print
Press Enter to show all options, press Tab go to next option

Construction Permit:

Required for all non-utility work within public right of way. This work includes: constructing, re-constructing any sidewalk, curb and gutter, drive approaches, storm drains, sewers or any other public improvement. Construction Permits require an inspector to verify that all new structures, backfills, sidewalk replacement, traffic control and other improvements have been properly constructed and installed in accordance with City Standards. All Construction permits require the appropriate contractor’s license and insurance which must be obtained prior to permit issuance.


Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer